Specifications:
Maximum digging depth: 5980-8160mm
Bucket digging force: ISO 151 *3kN
Long track type
Boom: 5.68m
Bucket rod: 2.91m
Bucket: 0.80m³ (SAE, PCSA full bucket)
Track: 600mm
Engine Ex-factory date: 2024
Engine operating time: 649 hours